Lane Closure on US 176 at Broad River Bridge Friday


By Crysty Vaughan

COLUMBIA, SC (WOLO)--If your commute takes you on US 176 across the Broad River Bridge between 6:00pm and 7:15pm Friday, be prepared for congestion.

The Lane Construction Corporation will be performing demolition activities that will impact traffic flow on Friday June 28th, 2013.

Traffic on US 176 at the Broad River Bridge will be stopped in both directions for approximately 5-15min between 7:00pm to 7:15pm.
Current: 56°
High: 56°
Low: 52°
Wind: 7 MPH
Pressure: 30.06
Humidity: 84 %

What's on WOLOTV Full Schedule